EPM-4029

Tekla PowerFab
2019i
Tekla PowerFab Tekla PowerFab GO
Previously, when you imported information from XML files to a production control job, drawing dates showed as changed in the import log if the date formats were different, even though the actual dates were the same. This has now been fixed.
Was this helpful?